Whenever a structure is located, erected or
moved on a previously vacant lot, the owner must adequately sod or
seed the lot with appropriate ground covering within one year following
occupancy of said structure.
Added 3-15-1993 by Ord. No. 8-93
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');